Generally, Earth Shoulder Construction for pavements and bases relates to the earthwork above subgrade elevation, adjacent to the sides of pavement or base. It may involve minor or major reshaping and replacement of embankment material. Earth Shoulder Finishing relates to earthwork adjacent to curb and gutter. Refer to Section 2123 of the Standard Specifications for information regarding earth shoulder construction or finishing.
Earth Shoulder Construction and Earth Shoulder Finishing should not be bid for the same shoulders.
Back to topBidding Earth Shoulder Construction
The Earth Shoulder Construction bid item includes material. Use Tab 112-9.
Back to topBidding Earth Shoulder Finishing
The Earth Shoulder Finishing bid item does not include the material; instead, the material should be included in excavation and/or topsoil bid items.