In some cases, items are left in place between construction projects. For example, TBR is placed with the construction of Project A. It is left upon completion of Project A for the contractor for Project B to use. For cases such as these, the items to be left in place should be documented and the documentation placed in the project file. For projects with FHWA oversight, a note should also be sent to FHWA identifying the projects and items.
If the items left in place are to be retained by the agency after completion of the last project, these items become salvaged materials. Refer to Section 1G-6 for more information regarding salvaged materials.